Crane work begins for new East Village modular student housing

The modular housing was fabricated off-site in a temperature-controlled factory by NRB Modular Solutions and is being transported to the site. Each of the 52 modules will be set on the foundation footprint by crane and joined together like building blocks to make one integrated building. Once the modules are in place, the joints will be sealed and weatherproofed.

https://www.castanet.net/news/Campus-Life-Kamloops/419348/Craning-begins-for-new-East-Village-modular-student-housing?

- Advertisement -

Subscribe to news alerts